# HAY and Muuto Outdoor furniture

Design outdoor furniture is suited for a wide variety of environments, from gardens, terraces or balconies to indoor places. Furniture for outdoor use is made of durable materials, so it can survive bad weather unscathed.

- **Number of products:** 629
- **Page:** 10 / 16

| Item | Brand | Price incl. VAT | Availability |
| --- | --- | --- | --- |
| [Linear Steel Coffee Table Ø70, grey](https://www.designville.eu/linear-steel-coffee-table-70-grey) | Muuto | 625.00 € | 3 - 4 weeks |
| [Linear Steel Coffee Table Ø70, pale blue](https://www.designville.eu/linear-steel-coffee-table-70-pale-blue) | Muuto | 625.00 € | 3 - 4 weeks |
| [Linear Steel Coffee Table Ø70, burnt orange](https://www.designville.eu/linear-steel-coffee-table-70-burnt-orange) | Muuto | 625.00 € | 3 - 4 weeks |
| [Linear Steel Coffee Table Ø70, dark green](https://www.designville.eu/linear-steel-coffee-table-70-dark-green) | Muuto | 625.00 € | 3 - 4 weeks |
| [Linear Steel Coffee Table Ø70, black](https://www.designville.eu/linear-steel-coffee-table-70-black) | Muuto | 625.00 € | 3 - 4 weeks |
| [Linear Steel Coffee Table Ø42, taupe](https://www.designville.eu/linear-steel-coffee-table-o42-taupe) | Muuto | 520.00 € | 3 - 4 weeks |
| [Linear Steel Coffee Table Ø42, grey](https://www.designville.eu/linear-steel-coffee-table-42-grey) | Muuto | 520.00 € | 3 - 4 weeks |
| [Linear Steel Coffee Table Ø42, pale blue](https://www.designville.eu/linear-steel-coffee-table-42-pale-blue) | Muuto | 520.00 € | 3 - 4 weeks |
| [Linear Steel Coffee Table Ø42, burnt orange](https://www.designville.eu/linear-steel-coffee-table-42-burnt-orange) | Muuto | 520.00 € | 3 - 4 weeks |
| [Linear Steel Coffee Table Ø42, dark green](https://www.designville.eu/linear-steel-coffee-table-42-dark-green) | Muuto | 520.00 € | 3 - 4 weeks |
| [Linear Steel Coffee Table Ø42, black](https://www.designville.eu/linear-steel-cafe-table-42-black) | Muuto | 520.00 € | 3 - 4 weeks |
| [Neu Table Low 60x60, anthracite](https://www.designville.eu/neu-table-low-60x60-anthracite) | HAY | 409.00 € | 3 - 4 weeks |
| [Neu Table Low Ø70, anthracite](https://www.designville.eu/neu-table-low-70-anthracite) | HAY | 449.00 € | 3 - 4 weeks |
| [Neu Table Low Ø60, anthracite](https://www.designville.eu/neu-table-low-60-anthracite) | HAY | 409.00 € | 7 - 9 weeks |
| [Flow Coffee Table, grey](https://www.designville.eu/flow-coffee-table-grey) | Muuto | 940.00 € | 3 - 4 weeks |
| [Flow Coffee Table, taupe](https://www.designville.eu/flow-coffee-table-taupe) | Muuto | 940.00 € | 3 - 4 weeks |
| [Flow Trolley 2-layer, grey](https://www.designville.eu/flow-trolley-2-layer-grey) | Muuto | 419.00 € | 3 - 4 weeks |
| [Flow Trolley 2-layer, taupe](https://www.designville.eu/flow-trolley-2-layer-taupe) | Muuto | 489.00 € | 3 - 4 weeks |
| [Flow Trolley 2-layer, blue-grey](https://www.designville.eu/flow-trolley-2-layer-blue-grey) | Muuto | 419.00 € | 3 - 4 weeks |
| [Crate Low Table, iron red](https://www.designville.eu/crate-low-table-iron-red) | HAY | 275.00 € | 2 - 3 weeks |
| [Crate Low Table, london fog](https://www.designville.eu/crate-low-table-london-fog) | HAY | 275.00 € | 2 - 3 weeks |
| [Crate Low Table, white](https://www.designville.eu/crate-low-table-white) | HAY | 275.00 € | 2 - 3 weeks |
| [Crate Low Table, pinewood](https://www.designville.eu/crate-low-table-pinewood) | HAY | 275.00 € | 2 - 3 weeks |
| [Crate Side Table, black](https://www.designville.eu/crate-side-table-black) | HAY | 285.00 € | 3 - 5 weeks |
| [Crate Side Table, london fog](https://www.designville.eu/crate-side-table-london-fog) | HAY | 285.00 € | 2 - 3 weeks |
| [Crate Side Table, white](https://www.designville.eu/crate-side-table-white) | HAY | 285.00 € | 2 - 3 weeks |
| [Crate Side Table, iron red](https://www.designville.eu/crate-side-table-iron-red) | HAY | 285.00 € | 2 - 3 weeks |
| [Crate Side Table, pinewood](https://www.designville.eu/crate-side-table-pinewood) | HAY | 285.00 € | 2 - 3 weeks |
| [Crate Low Table W75.5, black](https://www.designville.eu/crate-low-table-w75-5-black) | HAY | 339.00 € | 2 - 3 weeks |
| [Crate Low Table W75.5, iron red](https://www.designville.eu/crate-low-table-w75-5-iron-red) | HAY | 339.00 € | 2 - 3 weeks |
| [Crate Low Table W75.5, london fog](https://www.designville.eu/crate-low-table-w75-5-london-fog) | HAY | 339.00 € | 2 - 3 weeks |
| [Crate Low Table W75.5, white](https://www.designville.eu/crate-low-table-w75-5-white) | HAY | 339.00 € | 2 - 3 weeks |
| [Crate Low Table W75.5, pinewood](https://www.designville.eu/crate-low-table-w75-5-pinewood) | HAY | 339.00 € | 2 - 3 weeks |
| [Assemble Coffee Table, 135x55 cm teak](https://www.designville.eu/assemble-coffee-table-135x55-cm-teak) | Muuto | 795.00 € | 2 - 3 weeks |
| [Assemble Coffee Table, 55x55 cm teak](https://www.designville.eu/assemble-coffee-table-55x55-cm-teak) | Muuto | 495.00 € | 2 - 3 weeks |
| [Hee Bar Stool Low, black](https://www.designville.eu/hee-bar-stool-low-black) | HAY | 299.00 € | 2 - 3 weeks |
| [Hee Bar Stool Low, rust](https://www.designville.eu/hee-bar-stool-low-rust) | HAY | 299.00 € | In stock |
| [Hee Bar Stool Low, white](https://www.designville.eu/hee-bar-stool-low-white) | HAY | 299.00 € | 2 - 3 weeks |
| [Hee Bar Stool Low, fall green](https://www.designville.eu/hee-bar-stool-low-fall-green) | HAY | 299.00 € | 2 - 3 weeks |
| [Hee Bar Stool Low, hot galvanised](https://www.designville.eu/hee-bar-stool-low-hot-galvanised) | HAY | 379.00 € | 3 - 5 weeks |

[Next page](https://www.designville.eu/outdoor-furniture/f/muuto/hay.md?page=11)
